Glossary

Capacity on Demand (CoD)

CoD

Capacity on Demand lets selected IBM Power6 servers activate processor or memory resources that are already installed but not yet available for use.

The useful question is not whether a Power6 server supports Capacity on Demand. It is whether that exact machine has inactive resources and which activation rights already belong to it. The Hardware Management Console shows the installed, active, and available capacity.

The five POWER6 Capacity on Demand offerings

1. Capacity Upgrade on Demand

CUoD permanently activates eligible inactive processors or memory after an activation feature is purchased and its code is entered.

2. Trial Capacity on Demand

Trial CoD temporarily activates processors or memory for evaluation. IBM's POWER6 documentation describes a trial lasting 30 powered-on days.

3. On/Off Capacity on Demand

On/Off CoD temporarily activates processors or memory for a requested number of days. IBM records and bills that temporary use.

4. Utility Capacity on Demand

Utility CoD automatically adds processor capacity to the shared processor pool for short workload spikes. Usage is measured in processor-minute increments.

5. Capacity BackUp

Capacity BackUp uses inactive capacity on a disaster-recovery server that can be activated when the production system needs to fail over.

What to check on a Power6 system

Capacity on Demand evidence worth recording before a support or migration decision

CheckWhy it matters
Installed processors and memoryThis is the physical capacity in the server.
Active processors and memoryThis is the capacity currently available to partitions.
Inactive capacityInstalled hardware is not usable merely because it is present.
Activation history and codesThese show which rights were purchased or temporarily enabled.
Software licensing impactMore active capacity can change licensed software cost and tier exposure.

A used Power6 server may contain inactive processors or memory without including the right to activate them. Confirm the machine serial number, current CoD settings, and transferable entitlement before valuing that inactive capacity.

Start by identifying the exact Power6 model. Then read the CoD settings from its Hardware Management Console before treating inactive hardware as available capacity.

Related Context

Related Terms